
USIBWC CRP monitors stations in and below El Paso, with students from the University of Texas at El Paso and El Paso Community College.
![]() |
EPCC student collects from the river at Riverside when water was diverted into the river from the American Canal during the border fence construction, November 2009 |
![]() |
EPCC collects at Courchesne Bridge March 2009 |
![]() |
EPCC students at Courchesne Bridge, Station 13272, March 2009 |
![]() |
UTEP student Heather collects sediment samples while Liz and Rebecca collect flow measurements at Alamo Grade Structure Station 15795 near Fort Hancock TX |
![]() |
Reading the Flow Tracker to get flow measurements |
![]() |
American Dam staff collect samples at Courchesne Bridge |
![]() |
Alex from IBWC's American Dam field office collects samples in the Chamizal section of the river in El Paso |
![]() |
El Paso Water Utilities' International Laboratory analyzes samples from the river in El Paso |
![]() |
EPCC students collect field measurements on Alamo Grade control structure, July 2009 |
![]() |
EPCC students collect water samples from a bucket on Alamo Grade control structure, July 2009 |
![]() |
Kati collects field measurements in the river, July 2009 |
![]() |
Collecting flow at San Elizario station 16272 July 2009 |
![]() |
Collecting flow with UTEP students at Fabens POE, February 2009 |
![]() |
Leslie writes down field parameters at Fabens POE February 2009 |
![]() |
Collecting flow and water quality samples at Fabens POE, July 2009 |
![]() |
Low flow at Fabens POE Feb 2009 |
![]() |
Leslie collects bacteria samples during the 2010 flood in the Lower Rio Grande Valley near Mercedes, TX, August 2010 |
![]() |
EPCC student Carlos collects samples at Anthony February 2011 |
![]() |
Students from EPCC watch as IBWC staff collect samples at Courchesne, July 2010 |
Sampling at Fabens, December 2010 |
![]() |
CRP Home | Study Area | Monitoring Station Data | Calendar of Events | Publications | Gallery |